Solar rental potential at 92 Forrest Street Cottesloe, WA 6011
If you're considering installing or renting solar panels at 92 Forrest Street Cottesloe, WA 6011, this page will help you determine the solar potential of this property.
LEASE | Please Call For Details |
---|---|
LEASE RATE | N/A / m2 / year |
FLOOR AREA | |
CAR PARKS | unknown |
AGENT | Caporn Young Estate Agents |
The property consists of Offices.
, which is probably not suitable for a solar car park, but may still be suitable for ground mounted solar in addition to roof top solar.
Solar is booming in Peppermint Grove
The benefits of solar power are no secret to the Peppermint Grove and the greater Peppermint Grove Shire community. Over 4.25 million dollars (2,712 kW) of solar panels have been deployed in Peppermint Grove and surrounding suburbs (Cottesloe) as the community prioritises saving dollars and the environment.
Bring 92 Forrest Street Cottesloe, WA 6011 into the 21st centruy by renting and installing a solar panels.
Businesses and residents of Peppermint Grove are collectively generating $894,776 of energy at retail prices a year! This is based on an average of 12,257 kWh of energy production a day and retail electricity costs of 20c per kilowatt-hour. The solar panels in Peppermint Grove are also offsetting greenhouse gas emission, with the solar systems in Peppermint Grove reducing 3,132 tonnes of carbon dioxide emissions every year.
Considering renting solar panels at 92 Forrest Street Cottesloe, WA 6011? Try our solar lease calculator for commerical buildings.
Average daily consumption (kWh)
Cost of Electricty (cents)
How many days a week do you operate?
What percentage of your energy consumption do you estimate is during the day?
System Size (kW)?
How long would you like to lease the solar panels?
Savings on your electricity bill: $
Abatement of carbon dioxide emmissions: tonnes per annum
Your business at 92 Forrest Street Cottesloe, WA 6011 will be $ better off per year after paying for the solar rental. After the year rental term you will be $ better off!
On-site solar utilisation score
* above 50 is good, 100 is optimal.
Solar power availability in Peppermint Grove
Peppermint Grove gets solar irradiation levels of an annual average of 5.39 kilowatt hours per square metre. The following graph shows the daily average solar irradiation/power levels per kW installed in Peppermint Grove for each month.